Service Body Flip-Hatch Built By Highway Products


The Flip-Hatch gives you six more inches of entry space in the back of Highway Products service bodies.

Call West Coast Truck Equipment at 916-376-0690 for all of your Highway Products needs.

Types of Construction Equipment Available For Sale in UK


>

Distinct is required for different infrastructure purposes and also for the construction of buildings, malls, shops and apartment complexes, etc. These equipment and tools serve lots of alternatives according to their requirement. This post essentially throws light on all the several equipment and tools that are offered for sale in the UK. Apart from equipment and tools, even heavy machinery is mentioned in the post. All the technical details of the equipment and machinery are given.

Excavator
An excavator is utilised for digging of trenches, holes, foundations, material handling, forestry work, demolition, landscaping, heavy lifting, mining, river dredging, etc. Excavators run with the help of hydraulic fluids and are provided in compact form. The excavator is driven by wheels or tracks. They consist of a cab, bucket and boom on a rotating platform. These are available all over UK at the most reasonable costs.

Bulldozer
A bulldozer is also recognized as a crawler. It is usually utilised for pushing significant quantities of soil, dirt, rubble, sand, etc. throughout construction of buildings, etc. The bulldozer is equipped with a ripper at the rear utilised for loosening densely compacted materials. A bulldozer has immense strength and is utilised for lifting other tools as well. Bulldozers are use on construction web sites, military bases, mines, quarries and heavy business factories. Bulldozers are on the market in all the leading machinery stores in UK.

Crane
A crane is a multipurpose machine that is used extensively in construction industries for lifting purposes. A crane is equipped with wire ropes or chains, sheaves and winder. It is useful for lifting and lowering supplies at internet site of construction and in mines, quarries, military bases etc.

Road Roller
A is fundamentally used for compacting soil, gravel, asphalt, concrete, etc. in the construction of roads. Road rollers are extensively used in construction industries. Road rollers can be found at all equipment and machinery stores in UK.

Loader
A loader is utilized to load materials like rock, sand, wood chips, dirt, feed, gravel, raw minerals, logs, asphalt, debris, etc. into other machinery like dump truck, feed-hopper, etc. Loaders are many different sorts- bucket loader, front loader, scoop loader and front-end loader. Loaders are accessible for sale in most of the leading equipment stores in UK.

Drilling Machines
Drilling machines are used exclusively for drilling holes in the ground. They are also utilised for drilling water and oils from the earth. These machines are used extensively in oil industries, mining activities and construction industries. Some of the leading machinery and equipment stores in UK offer you drilling machines at cost-successful rates.

The above mentioned are some of the most favorite machinery and equipment that are utilized extensively for construction purposes. Now that you have read a brief introduction about these machinery items, it would be easier for you to choose which equipment you demand and for what purpose. All these machines are obtainable in various stores in UK and are sold by manufacturers directly or by means of retailers.

AIT offers Professional Master in Project Management in Construction in Vietnam (HCM, HANOI, CANTHO and VUNGTAU)


In Vietnam, Asian Institute of Technology ( http://www.set.ait.ac.th/ceim or http://www.aitcv.ac.vn ) is offering a very innovative program called Professional Master in Project Management in Construction (in short, MPM). MPM program is innovative because the curriculum is designed by combining modern theories and best practice (practical) applications of project management in construction projects. The program aims to train and develop project engineers and project managers to be able to grasp the important theories of project management and be able to apply in construction projects.

What will you learn?
- project planning and scheduling management
- organization management in construction
- project cost and financial management
- communication and negotiation skills for project managers
- occupational safety and health management in construction
- quality management in construction
- project financing
- legal and contractual risk management
- applied project management in petrochemical project
- applied project management in highrise building project
- applied project management in housing and real estate project
- applied project management in public infrastructure project
- applied project management in commercial project
- construction business and project simulation

How long does it take to complete the master program? the program is design as a one year master degree. with your hardwork, you will be able to complete in one year.

Who should study this subject? if your work is related with project management in construction, this program is very useful for your career and company.

who will teach this course? the courses will be taught by professors from AIT, Japan, USA, Europe and Professional Project Managers from large construction companies and projects.

what is the teaching schedule? the classes will be delivered on evening and weekend.

Where will we open this program? we will open in Hanoi, HoChiMinh , Vung Tau and Cantho.

Where can you get more detail information?
- For Hanoi, please contact Ms Luong phone 01 285 687 168 email luongtth@aitcv.ac.vn
- For HCM, Vung Tau and Cantho, pleasse contat Ms Tuong phone 01 285 687 168 email ngletuong@aitcv.ac.vn

Many thanks
Dr BHW Hadikusumo
Associate Professor
CEIM and MPM Coordinators

CEIM open applications for August 2011 intake

We open the application for August 2011 intake for AIT Thailand campus. Limited numbers of scholarships are available for talented applicants. Some of the scholarships are Royal Thai Government scholarship, The King of Thailand scholarship, The Queen of Thailand Scholarship, Asian Development Bank scholarship etc.

What is CEIM? CEIM master and doctoral programs aim to prepare engineers to manage large construction projects starting from planning, design, tendering, construction and commissioning.

What will you learn? you will learn important knowledge and skills in project management in construction such as project planning/scheduling, project cost and financial management, organizational management, project contract, project risk, project quality management, project performance management and project financing.

Where will you work after graduation? You can work in strategic industries that highly need project management such as:
- Contractors (highway, building, oil/gas and energy)
- Consultants
- Property and real estate developers
- Bank and Invesment companies
- Public Private Partnership Consortium
- Financial and Banking institutions that lend fundings for construction projects
- hotel and apartment development
- oil and gas construction

What else will you learn during your study with us in AIT?
AIT is a very multicultural insitute. Our students and faculty members come from different parts of the world such as Thailand, Vietnam, Bangladesh, India, Taiwan, Pakistan, Indonesia, China, Korea, European Union. Aside from studying knowledge, you will also learn different cultures and different ways of thinking from your friends; and develop your global international networking.


Please contact CEIM Secretary (Ms. Woranuch, phone 025246060 or email woranuch@ait.ac.th) for further information.

Visit CEIM: http://www.set.ait.ac.th/ceim
How to apply? http://www.ait.ac.th/AIT/admissions/admissions


Regards
Dr. BHW Hadikusumo
Associate Professor
CEIM Coordinator
MPM Coordinator

Project Schedule Internal Risk Management in EPC Gas Pipeline Project: A Case Study

Oil and gas sector is considered as a backbone of any country’s economy. In Viet Nam, the promotion of gas industry development since the early 1990s has significantly contributed to the economic development of the country.
The demand of domestic gas consumption is being increased in a very short time. Therefore, Petro Vietnam has cooperated with national and international petroleum companies to speed up the plan of developing and building of the new gas fields in the southeast sea and southwest sea of Vietnam. As a result, lot of new pipelines will be installed to transport gas from field to shore of Vietnam, and this process involves many risks. Due to the unique characteristic of this project, the risk management during project execution became very important activity because the risks may have effect on cost, schedule and quality of the project. Risk management is a key to successful project implementation.

For most effective and efficient risk management, it is recommend to plan, analyze and manage risk in all phases of project life cycle specifically from design to construction phase.

Mr. Pham Binh Lam made a case study which objectives were to: (1) describe key activities in EPC gas pipeline project ; (2) identify risk factor in implement the EPC gas pipeline project which may affect the project schedule; and (3) propose risk solution that can be used to manage in the EPC gas pipeline project

Conclusion

Based on the data collected mainly from Bloc B&52-Omon gas pipeline project of Petro VietNam Gas Corporation, the author has clarified that EPC gas pipeline project contains high risk during project execution. The very important stages are from engineering stage to construction stage because these stages influence the quality of gas pipeline project. There are a lot of risk factor impacts on the project schedule in these periods such as experience, knowledge and skill of owner, contractor, subcontractors, design change, and environment impact. Pipeline construction in the offshore environment as well as onshore environment which across many rivers and canals are difficult and dangerous activity which lead to accidents and incidents frequencies happen especially if this project have a long distance from offshore to onshore pipeline route. It will not only cause project delays but also directly and indirectly cause very high project cost.
Major risk factors which may affect EPC gas pipeline project schedule has been identified by and facilitated during the brainstorming session of key experience stakeholders in this project such as top management, project manager, site manager, HSE manager, office personnel and the author.

The author has proposed appropriate strategies to reduce major risks schedule in EPC gas pipeline project by conducting a Framework on EPC Schedule Risk Management through a real gas pipline project case study -Block B – Omon gas pipeline project.The results are shown in the table below.


Recommendation

In order to obtain efficient schedule risk management in EPC gas pipeline project this study proposes a number of recommendations:
- Experience project management team should be appointed to the selection EPC contractor

- The EPC contractor has to contribute audit procedure for detailed designer to select qualified designer effectively. In addition, review and approval by Project Management team (PMT) of both selection of detailed designer and approval of designed document

- The EPC contractor and subcontractor should contribute an effective and efficient safety management system

- An effective communication and coordination system between lower stake holder (e.g. EPC contractor, subcontractor, vendor, etc) should be set up

- The owners should have high commitment of all people involved especially top management commitment in all stage of project and hand over authority to make decision.

- The Risk Management Plan should be reviewed during the EPC phase as specified in the Project Management Plan to ensure that appropriate actions have been taken and followed up. Reviews should also occur at the commencement of a new project phase or if there are significant changes to the project scope or operating environment.
His thesis abstract is copied and posted.

Abstract

In order to adapt the demand of domestic gas consumption is being increased in very short time PetroVietnam has cooperated together with national and international petroleum companies to speed up the plan of developing and building new gas fields in the southeast sea and southwest sea of Vietnam. Therefore a lot of new pipelines will be installed to transport gas from field to shore of Vietnam. In oil and gas project specify gas pipeline project contains high risk during project execution because of interacting activities of many event in condition of limited time, human resource and budget and the participation of many different parties in the project with the role, responsibilities as well as different objectives make the project more complex. Additional, only four gas pipelines project that built in Vietnam. Due to the unique characteristic of these project, the risk management during project execution is became very importance activity because the risks effect on cost, schedule and quality of the project. Risk management is a key to successful project implementation The author has identified mayor significant risks which impact project schedule and has proposed appropriate strategies to reduce major risks schedule in EPC gas pipeline project by conducting a Framework on EPC Schedule Risk Management through a real gas pipeline project case study -Block B – Omon gas pipeline project.