Used Construction Equipment: MSloane Consulting for Mining and Construction continues to provide used construction equipment worldwide. This, amidst the decline in U.S. machinery exports for 2009 dropping at 28% from 2008's $12.8 billion worth of machinery exports, according to the Association of Equipment Manufacturers (AEM).
Canada -- $3.7 billion, down 41% Mexico -- $1 billion, down 28% Australia -- $922 million, down 47% Chile -- $763 million, down 16% Brazil -- $513 million, down 29% China -- $487 million, up 15% Colombia -- $392 million, down 17% Belgium -- $360 million, down 48% South Africa -- $353 million, down 49% Peru -- $319 million, down 20% Saudi Arabia -- $238 million, down 44% Singapore -- $214 million, down 48% Russia -- $209 million, down 58% India -- $181 million, up 55% Venezuela -- $165 million, down 57%
- Price: $137,000 USD ea ex-works or best offer plus 6% Buyers fee. Plus GST charges for Australian Buyers - Hours: 3,507 to 4,536 - Weight: 14 Tons - Location: Australia
Features:
- Air Conditioner - Bed, Standard - Auto Lube - Retarder - Tailgate
Used Construction Equipment: Meridian Systems, the Plan-Build-Operate technology solutions leader for project-based organizations, announced in a press release, that Weston Solutions, Inc. (WESTON(R)) has selected Proliance(R) software to standardize its construction management processes.
With more than 60 offices around the globe, WESTON, ranked 35 on the ENR top 200 environmental firms and 65 on the ENR top 500 design firms, is a global leader in environmental solutions, sustainable development, design/build construction, green buildings, and clean energy.
Used Mining Equipment for Sale: Alix Resources plans to eventually mine a site for Rare Earth Oxides by acquiring a block of land of approximately 450 hectares in British Columbia which hosts a historic BC Minfile 2.04% Rare Earth Oxide (REO) manifestation at random across a 15 metre section.
Used Construction Equipment: Stimulus funds from the US Federal Government have saved or created more construction jobs, helped sold new and used construction equipment than previously thought, according to the Associated General Contractors of America.
Ken Simonson, chief economist of AGC said that Obama's stimulus package is one of the very few life savers that the construction industry experienced last year and is one of the few hopes to keep it going in 2010.
See one of our used construction equipment for sale.
Used Mining Equipment for Sale: Mindoro Resources targets 50 to 70 million dry metric tonnes (DMT) in a grade range of 0.9% to 1.2% nickel and 28% to 32% iron from its limonite and saprolite exploration in northern Surigao.
This is in addition to Mindoro's Agata North Project, which has an indicated and measured resource of 26.92 million DMT at 1.11% nickel and 0.06% cobalt, containing 657 million pounds of nickel and 24 million pounds of cobalt, and an additional 3.79 million DMT in the inferred category, containing 89 million pounds of nickel and 2 million pounds of cobalt.
The Surigao projects are in an important nickel producing district. The Agata North project contains major strategic nickel laterite resources with strong competitive advantages, including excellent infrastructure, close proximity to the ocean and markets, abundant limestone on site and potential for establishment of a world-class nickel and cobalt processing operation.
Used Construction Equipment: The construction of infrastructure and sports venues for the London 2012 Olympic and Paralympic Games remains on time and within budget, says the Government. In an update on preparations for the event, the Department for Culture, Media and Sport said that the anticipated final cost of the project has risen by £21 million (0.3 per cent) to £7.262 billion since the publication of the last report.
Used Mining Equipment for Sale: Nass Valley Gateway Ltd., is geared to explore gold prospect sites in Ontario, Canada as it announce the signing of an Acquisition Agreement with Golden Dawn Minerals Inc. (GOM), while MSloane Consulting provides used mining equipment for sale to mining companies anywhere in the world. This acquisition gives the Company an option to acquire an 80% Joint Venture interest in three gold prospects within the Larder Lake Mining Division of the Province of Ontario, Canada.
The three properties, Central Catharine, Link-Catharine, and the 80-Foot-Fall property are located within the Boston-Skead gold belt of northeastern Ontario. This crescent-shaped gold belt is 25 km south of the still productive Kirkland Lake gold belt that has yielded 24 million ounces of gold in the past century of mining. Gold mineralization in this belt occurs with quartz, quartz-sulphide veins and veinlets in Archean volcanic rocks that have been intruded by granitic batholiths.
For the Link-Catharine area lying centrally between the other two properties, the most recent exploration work within the package of properties was conducted in 2008 and 2009. Highlights include 3.55g/t gold over 3 m and 3.26 g/t gold over 1.2 m in hole DDH CAT 08-22, and 1.01g/t gold over 10 m and 2.65 g/t gold over 3.4 m in DDH CAT 08-04, and 17.5g/t gold over 1 m in DDH CAT 09-02. Together with values of 6.00g/t over 8.6 m and 1.91g/t gold over 20.4 m from hole 99-4, and encouraging gold values from numerous other holes within a broad target area, the results suggest an extensive zone of gold mineralization that warrants concerted continued evaluation for gold deposits.
Used Construction Equipment: In a press release, JCB and Volvo Construction Equipment (STO:VOLVA) (STO:VOLVB) said they have entered into a framework agreement under which they will cooperate on the engineering and manufacturing of skid steer loader and compact tracked loader products for distribution under their respective brands and through their respective global dealer networks.
It is envisaged that the first mono boom Volvo branded machines will be in production at JCB’s Savannah, Georgia facility by year end 2010. Volvo Construction Equipment will then transition skid steer loader models over time from its Pederneiras facility in Brazil.
The mine hosts approximately 340mt of resources over an area of 128,979ha. The reserves are stated at an assumed grade of 0.014% U305. Upon commissioning, the mine is poised to become the largest in southern Africa and the tenth-largest in the world. The estimated mine life is 12 years.
Prospects for the Angat hydroelectric power plant is heating up as MSloane Consulting is prepared to provide used construction equipment for any construction or upgrade projects around the country and world. Ayala Corp. and the diversified unit of Hong Kong's First Pacific Co. Ltd. have agreed to jointly bid for the government's 246-megawatt Angat hydroelectric power plant in Bulacan. The two have executed a letter-agreement confirming their interest to participate in the auction of the plant this April, they told the Philippine Stock Exchange in separate disclosures.
Ayala and Metro Pacific Investments Corp. (MPIC) will bid for Angat through Michigan Power Inc., a subsidiary of Ayala that submitted a letter of interest to state privatization agency Power Sector and Assets Liablities Management Corp. (PSALM). Michigan Power will be owned by Ayala, MPIC and a technical partner who will be allocated an equity, as required in the bidding procedures.
"This initiative is in line with Ayala's desire to participate in the power sector, especially in the realm of clean and renewable energy," Ayala said. This is the first foray of the country's oldest conglomerate into power generation, which is generally considered as a potentially high-growth sector. Ayala Corp officials had previously said the passage of the Philippine Renewable Energy Act, which gives fiscal incentives and priority at the grid to operators of renewable energy power plants, has encouraged them to venture into power generation.
The Anita project in Lac Saint-Jean region of Quebec, Canada is a niobium and tantalum mining project. The project is currently in the metallurgy testing stage as MSloane Consulting continues to provide used mining equipment for sale to mining projects worldwide. The potential to operate the mine as an open pit mine for 18 years is also being assessed. Preliminary ore flow sheet designs for the open pit, flotation plant, lixiviation processes and other mining infrastructure have been completed.
The mine contains approximately 25.75mt of indicated reserves to a depth of 250m. An additional 16.88mt of inferred resources are estimated between 250m and 350m. The reserves stated at an assumed cut-off grade of 1,000g/t Nb.
Everything is going to plan and the Olympic Games deadline looks within easy reach for the project team of contractor Sir Robert McAlpine, designer Buro Happold and Populous.
Used Mining Equipment for Sale: Gold Reach Resources said it has acquired a 100% interest in 13 new mineral sites consisting of 5,081 hectares called the Auro Property. Using public data from the Geological Survey of Canada the Company has identified an airborne magnetic high anomaly trending southeast from the Richfield discovery onto the new claims. The stronger part of this magnetic anomaly lies central to the claims and is approximately 6 kilometres long and 2 kilometres wide.
Used Construction Equipment: In news a report, Philippine construction this year is expected to surpass its 9 percent growth in 2009 as the economy continues to recover. Philippine Construction Authority executive director Lito Madrasto said the domestic industry is expected to grow a minimum of 9 percent versus last year. ”We were not badly affected really by the global financial crisis, the banks are awash with cash because of the strong OFW remittances,” Madrasto said.
The private sector is also expected to lead the growth in the industry with continuing investments in the residential, commercial and tourism sectors. The growth would be driven by strong demand in the BPO sector and mining sectors.
The Transportation Construction Coalition’s just released a survey showing that 81.2 percent of 527 transportation contractor respondents said that they will not buy new construction equipment in 2010. A contractor on the teleconference that announced the survey said that, "We'd rather buy used construction equipment, than buy new ones." Also, another contractor put this figure in prospective: “We have 60 percent of our equipment parked in our yard with nothing to do,” said Dean Word, president, Dean Word Construction, New Braunfels, Texas. “We are not spending money on new equipment. If we find we have a particular need for specialty equipment, we’ll lease it and then send it back.”
Dove Diamonds & Mining reports that diamond prices are up 61% from a Q1 bottom. MSloane Consulting provides used mining equipment for sale to mining companies around the world. Mr. Dovid Hauck, CEO of Dove Diamonds & Mining Inc. also said that, "Rough diamond prices have improved by at least 61% from the lows experienced at the weakest point of the market, in the first quarter of the year. Going forward, mine supply for rough diamonds will remain constrained, implying continued price rises in the near term, increasing in velocity as the US economic recovers.”