Used Mining Equipment for Sale: Goodwin Barsby Stone Crusher

Used Mining Equipment for Sale: Goodwin Barsby Stone Crusher



Asking Price: $425,000 USD

As-is, where-is, FOB Indonesian Port

* Primary crushing circuit Goodwin Barsby 42 x 30 Jaw Crusher
* Stand and Braces
* Guards/ Walkways/ Handrails/ Ladders
* 150 KW Electric Motor
* Vee Belt drive system
* Feed Bin and Braces
* Feeder and 30 KW variable speed drive
* Discharge conveyor with 15 KW drive (in component form)
* Secondary Crusher and Screening Circuit
* Hazemag 1313 Impact Crusher Eljay 16 x 6 Screen Plant
* 200 KW Electric Motor and Vee drive (to suit impact crusher)
* 22 KW Electric Motor and Vee drive ( to suit impact crusher)
* Hydraulic system to suit Impact Crusher (In component form including hydraulic power unit, rams, piping and fitting)
* Disharge Conveyor for Screen
* Discharge Conveyor for Impact Crusher
* Recirculating Conveyor in component form
* Stacker conveyor in component form
* Container Electrical Control Centre
* Caterpillar 3412 Containerised Generator Serial No. 6FA0 and connector to interconnect complete plant
* Crushing and Screening Plant Control Room
* Supports/ Ladders/ Walkways for Control room

For this used mining equipment for sale, contact MSloane Consulting.

Used Construction Equipment: Crossrail's Canary Wharf in London





Crossrail reached its first major construction milestone after the installation of the first tubular steel piles for the newly renamed Canary Wharf station. This is the beginning of the £15.9bn mega rail project.

In the photos, you will see the first pile installed, and renderings of the Canary Wharf. Used construction equipment are now widely used to save on equipment procurement and maintenance costs.

MSloane Consulting
can help you assess whether brand new or used construction equipment is best for a particular construction function or for an entire project based on your financial position, project life cycle, and post-project equipment valuation, asset liquidation and disposition scenarios.

Crossrail's route will stretch 118km from Maidenhead and Heathrow in the west, through 21.5km of twin bored tunnels through central London, and on to Canary Wharf, Woolwich, Abbey Wood and Shenfield in the east.

Surveying and enabling works are already well underway at many locations along this route and the property acquisition process has also begun. And last weekend saw the closure of Charing Cross Road in London’s West End as plant was mobilised ready to tackle the demolition of buildings around Tottenham Court Road Underground station. This is being upgraded as part of London Underground improvement works and will also interface with a Crossrail station.

But all eyes are now on Canary Wharf station − known as Isle of Dogs until last week when it was renamed by developer Canary Wharf Group which is putting £150M into its construction. It will be the first station to be complete along the route and is scheduled to be ready for handover to Crossrail by summer 2012.

At that point the station will comprise a watertight cofferdam in the North Dock of West India Quay, running along the northern edge of Canary Wharf.

Once complete it will be ready to welcome the tunnel boring machine that will be working its way westward from the Limmo Peninsula across the Thames to the east.

Heavy Equipment for Sale: New Nickel Mineralization Discovered in Timmins, Ont.

Golden Chalice Resources announces their discovery of new nickel deposits approximately 500 meters east of the Langmuir Nickel Discovery Zone at its Langmuir Property, 35 km southeast of Timmins, Ont.

Mining equipment will soon move in position to mine this area. For heavy equipment for sale, for your mining operarions, visit MSloane Consulting.

Hole GCL09-11, the last hole of the 2009 winter drilling program, returned elevated nickel mineralization grading up to 0.34% nickel over a 2.4-meter drilled width from 372.50 to 374.90 meters, which includes 0.5% nickel over 0.7 meters.

The host rock is a channel peridotite flow horizon similar to that hosting the Langmuir Nickel Discovery Zone (W4), where drilling in May of 2007 had intersected 1.14% nickel over 72.5 meters., and the recent significant W2 Nickel Discovery of 1.72% nickel over 3.0 meters , about 1.5 km east of the Langmuir Nickel Discovery Zone. Company geologists have not yet determined whether this is a new channel flow horizon hosting nickel sulphides or is the same flow horizon hosting nickel mineralization in either the Langmuir Nickel Discovery Zone (W4) or the W2 Discovery.

List of New Graduates (May 2009)

Construction, Engineering and Infrastructure Management

No. * Name * Country * Degree

1 . Kedsuda Limsila , Thailand - D. Eng'g
2 . Raman Awale , Nepal - M. Eng'g
3 . Pichaya Bhanubhak , Thailand - M. Eng'g
4 . Dam Thanh Binh , Vietnam - M. Eng'g
5 . Kantanat Chaipermsak , Thailand - M. Eng'g
6 . Werayutdh Chuenchana , Thailand - M. Eng'g
7 . Tran Viet Dung , Vietnam - M. Eng'g
8 . Aung Myo Hein , Myanmar - M. Eng'g
9 . Panwimon Jornjaran , Thailand - M. Eng'g
10 . Kriangsak Kiatkittikorn , Thailand - M. Eng'g
11 . Ahsen Maqsoom , Pakistan - M. Eng'g
12 . Swe Zin Myint , Myanmar - M. Eng'g
13 . Nguyen Viet Nhan , Vietnam - M. Eng'g
14 . Tran Duc Nhat , Vietnam - M. Eng'g
15 . Surapong Panja , Thailand - M. Eng'g
16 . Rahongsree Prayongrut , Thailand - M. Eng'g
17 . Thotsaphol Rattananapalai, Thailand - M. Eng'g
18 . Htet Htet Shein , Myanmar - M. Eng'g
19 . Korakade Thamphongsri , Thailand - M. Eng'g
20 . Piyada Thanarojsakul , Thailand - M. Eng'g
21 . Piyachat Thaveelert , Thailand - M. Eng'g
22 . Pham Vuong Trung , Vietnam - M. Eng'g
23 . Le Quang Tuan , Vietnam - M. Eng'g

Project Management in Construction

1 . Ngo Duc Binh , Vietnam - Professional Master

Construction Equipment: Volga and Novatek Oil & Gas and Infrastructure Projects

Funds and construction equipment will flow to Russia's Novatek oil & gas and infrastructure as projects as Volga Resources SICAV-SIF S.A, the Luxembourg-based investment company, announced that it has agreed to purchase 13.13% shares of OAO Novatek from Cartagena Development Inc. which is indirectly controlled by Novatek’s management. This move brings Volga’s total holding in Novatek to 18.2%.

The founder and largest shareholder of Volga, Guennadi Timtchenko was elected to the Board of Directors of Novatek. After meeting all regulatory approvals, the share purchase transaction will be completed.

Volga Resources SICAV-SIF S.A. is a private investment company registered in Luxembourg in 2007. The company is involved in various projects in the oil & gas sector, infrastructure, development, financial services in Central and Eastern Europe, CIS, Russia and Turkey, through its investments.

OAO NOVATEK is Russia’s largest independent gas producer and the second-largest natural gas producer in Russia. Founded in 1994, the company is engaged in the exploration, production, processing and marketing of natural gas and liquid hydrocarbons. The company’s upstream activities are concentrated in the prolific Yamal-Nenets Region, which is the world’s largest natural gas producing area and accounts for over 90% of Russia’s natural gas production and 20% of the world’s gas production.