During 2008 EurOmax completed a detailed mapping and soil geochemistry program defining a 6 kilometer long zone of strongly altered andesite volcanics and intrusives with abundant ancient mine workings. Drilling at the northern end of this trend by EurOmax in 2008 intersected multiple gossan and massive sulphide intervals, one of which reported 12.4 metres at 1.5% copper, 1.4% lead, 0.8% zinc, 62 g/t silver and 1.6 g/t gold. This program also defined a 3 kilometre by 2 kilometre magmatic complex at the southern end of the trend which remained undrilled in 2008. This feature is now the focus of the 2009 exploration program.
Mining Equipment: EurOmax commences diamond drilling at Ceovishte project, Serbia
Mining Equipment: EurOmax Resources Limited announce that it has commenced a 13 square kilometre geophysical program and a 2,500 metre diamond drilling program at Ceovishte to test two large gold bearing breccia bodies.