Problems in the design of large-scale construction projects may come from many stakeholders: Owner, Designer, Project Management Consultant and external environment.
There are many kinds of problem arising from the Owner such as (i) sometimes they can’t finalize what they really expect in their project. The requirements are very vague and just base on their feeling; (ii) the structure is not well-organized. Everybody can give out opinions but no one makes decision; (iii) when employing the consultants, owners don’t have the right model of project team structure. The consultants are not put in the right position with proper scope of works and obligation.
The problems of Project Management Consultant are that sometimes they can’t fulfill their duty in assisting Client to conclude their requirements reasonably and to arrange the project team structure in a right way or can’t define the procedure of working and making decisions. Also, they can’t well manage the project team to shorten the time, eliminate the error, and reduce the cost. The project working environment is not efficient and effective because people in the team are not aware of the other member’s duties or how to contact them. In other words, many Project Managers in Viet Nam nowadays are just the Post Men.
As to Designer, most of their problems come from the unclear design contract without necessary conditions binding relevant parties to their commitment. This weak point becomes more serious especially to the large projects owned by many organizations and involve in many parties with different cultures, different customs and constructive understanding.
Last but not least, problems may emerge from the external environment, such as laws, regulations or market. These factors form an uncertain circumstance which needs to be well identified, and planned the measures to deal with.
Mr. Do Tran My Thuy made a case study which objectives were to: (1) identify the key risks affecting time, cost or quality during design process; (2) find out how to mitigate these risks through contract conditions, communication or some other management tools. Also, to define the role, responsibility of three parties: Owner, Project Management Consultant and Designer in mitigating these risks; and (3) identify the activities and required documents in each step of Design process.
Conclusion
In the design of large-scale projects which involved many investors and many professors in different fields, there are usually 12 risks relating to 3 groups of stakeholders such as Owners, Project team and external environment. Two among these risks are from the external environments which are “unpredictable response from Authorities” and “changes by unforeseeable causes”. These are difficult to be prevented, so the mitigation is just the negotiation between Owner and Designer on how to share the consequences if the risks happen. Ten reminders can be prevented or mitigated through a proper working process and three kinds of document.
A proper working process is the one which creates the reliable bases for the Owner to make proper decisions.
Three kinds of document are Design service contract, Design Brief and Project Management Plan. The purpose of these documents is to set out a clear, impartial working environment for all parties in the project. Depending on the specific situation of the project, each document can be amended a little bit, but there are some critical issues in these documents which are necessary to be considered and discussed carefully by the Owner, Designer and Project Management Consultant. The role and responsibility of these three parties during the design process are also found. Details of the finding are summarized in figure 4-1. Apart from these preparations, another tool to mitigate the risk is Communication. Communication should also be planned through three aspects: communication method, communication form and critical points to communicate.
Recommendation
The Project Manager should consider the steps shown in the table to prepare for large-scale construction projects.
His thesis abstract is copied and posted.
Abstract
Managing risks in construction project has been recognized as one of the key factors in the process leading to the success in term of time, cost and quality of a project. However, until now most researches in risk management have focused on the construction phase, rather than design phase. This paper aims to identify the risks in the design of large-scale construction projects and find out how to mitigate these risks. Through the two case studies in two different types of projects (one Urban Area project and one Building project), twelve risks are identified and risk mitigation are proposed. It is concluded that to mitigate these risks, the Project Manager should pay attention in several issues. Firstly, the Pre-design phase at the beginning of each project can not be omitted. This important phase results in a Design Brief and Project Management Plan which together with the Design Service contract made stronger commitments of parties. Secondly, FIDIC- white book which is usually used as the standard form in Architectural Design practice in Viet Nam nowadays needs to be added or amended some conditions. Lastly, communication also needs to be planned and implemented in a right way.